The Karnataka government is considering a new elevated corridor to ease congestion for motorists travelling to Kempegowda International Airport from north Bengaluru, Chief Minister D.K. Shivakumar said on Wednesday. According to sources, the plan is to build a 19.275-km elevated corridor from Mother Teresa Circle in Ulsoor to Bagalur, offering a direct north-south connection and an alternative to the Nagavara-Bagalur corridor.

The corridor will begin at Mother Teresa Circle, where it would link to the proposed Yeshwantpur-K.R. Puram elevated corridor through an elevated rotary, and pass through key junctions and areas including Hennur Cross, Vaddarapalya and Kannur before ending at Bagalur. Mr. Shivakumar said the government was examining options for a permanent solution to congestion along a stretch of about 20 km that affects both airport-bound traffic and vehicles entering the city from the north. Motorists currently depend largely on the existing route, he said.

“We will have to examine whether it should be built on the Hebbal model or whether another arrangement will be more suitable. We have instructed officials to study the options and will take a decision after discussions with officials, Ministers and MLAs,” he said.

The Chief Minister was speaking after inaugurating and laying foundation stones for infrastructure projects worth ₹522.23 crore in Bengaluru. He inaugurated the Jakkur railway overbridge in Byatarayanapura and a stormwater drain built across railway tracks at Geddalahalli in K.R. Puram, and laid the foundation stone for a rotary flyover near IOC Junction on Maruthi Sevanagar Main Road. He said a Bengaluru North City Corporation office opposite Jakkur airport is also in the pipeline, and described the proposed rotary flyover as technically challenging, adding that officials have been instructed to complete it on priority with minimal traffic disruption.