A high-level meeting will be convened to discuss the comprehensive development of the Kollam Chinnakada–Edamon stretch of National Highway 744, Chief Minister V.D. Satheesan has assured, according to N.K. Premachandran, MP. The Union Ministry of Road Transport and Highways has already expressed its readiness to take up a one-time development project for the Chinnakada–Edamon corridor.
Mr. Premachandran said easing traffic congestion and ensuring smooth transit on the stretch would be possible only through comprehensive widening. He said the Central government was prepared to develop the road into a four-lane highway using Central funds, but the project was currently stalled due to a shortage of available land, requiring the State government to step in and facilitate land acquisition.
Stressing the urgency of the project, the MP said the existing Chinnakada–Edamon stretch is set to be delisted from the National Highway network once the upcoming Kadambattukonam–Edamon Greenfield Highway becomes operational. Because the new greenfield alignment begins 26 kilometres away from the current route, it will not serve as an effective alternative or reduce the heavy traffic volume on the existing Chinnakada–Edamon road, he said.
Mr. Premachandran said the State government must capitalise on the available Central funding to widen the existing road to its maximum possible capacity before it loses its National Highway status. He said the Chief Minister has acknowledged the gravity of the issue and assured that a high-level meeting will be convened to move the plan forward.
