The Keralam government is likely to scale up the proposed railway tunnel linking Balaramapuram with the Vizhinjam International Seaport to allow double-stack container transport, according to sources. As part of the move, a tender floated a few months ago for a conventional tunnel designed for single-stack containers has been cancelled.
Sources said the newly formed United Democratic Front (UDF) government began exploring the upgrade as Chief Minister V.D. Satheesan, who holds the Ports portfolio, seeks to make the State a major maritime hub under the Mission Samudra project, a five-year maritime economic transformation initiative aimed at integrating all major and minor ports in the State. The previous Left Democratic Front (LDF) government had conceived a 10.7-km broad-gauge underground rail link from Balaramapuram to the Vizhinjam port yard beneath the Vizhinjam-Balaramapuram road. Towards the end of its tenure, the Konkan Railway Corporation Ltd (KRCL) floated an engineering, procurement and construction tender for the project. The tender has since been cancelled, and the KRCL is expected to float a revised one with major changes in the next one or two months. The corporation had earlier signed an MoU with the State government to provide rail connectivity to the port from Balaramapuram.
The proposed modifications are likely to raise the project cost substantially. The estimated cost stood at ₹533.67 crore in 2016, while the recently revised estimate put it at around ₹1,500 crore; it could exceed ₹2,000 crore on completion given delays in execution.
A senior bureaucrat said a final decision on upgrading the tunnel and associated rail infrastructure for double-stack containers was yet to be taken, though several modifications have been proposed at the port end in view of Vizhinjam's growing potential. The port handled a record volume of cargo in its first year of commercial operations, and its second phase is expected to be completed by 2028, significantly scaling up capacity. There are also concerns about the cash-strapped State government's ability to bear the entire cost of the rail link. The officer said the State government had been pressing the Centre to fund the project, arguing that the rail link would primarily benefit States outside Keralam.
